The 47.2-inch-diameter cutting reels can cut through 4,200 tons of snow per hour and have the ability to blow snow 50 to 100 feet off the line.
The new snowblower will be delivered in Spring 2021 with the first new train set.
The complete renovation (track, rail cars and depot) and renaissance of the famed Colorado Cog Railway, which reaches up to 14,115 feet and is the highest railway in America, has less than 1 mile of track left to complete.
The Railway is still on track for with a May 2021 reopening.
Sure would love to see a video of the sucker running!
ReplyDelete