One of the boulders remains embedded in the highway, according to the Colorado DOT, which described it as the size of a building and said it will have to be blasted into smaller pieces before being moved off the highway.
https://www.cnn.com/2019/05/25/us/huge-boulder-blocks-co-highway-trnd/index.html
https://durangoherald.com/articles/278479-crews-build-bypass-around-boulder-blocking-colorado-highway-145#slide=1
No comments:
Post a Comment